Case Study: IRC in Oxfordshire — A Cost-Effective Anti-Ligature Package Delivered to Programme

Case Study: IRC in Oxfordshire — A Cost-Effective Anti-Ligature Package Delivered to Programme

A major IRC build in Oxfordshire required an alternative anti-ligature solution that was commercially sensible,
bespoke to site needs, and capable of being delivered at pace as the project progressed.

Coverad carried out the survey, then manufactured, supplied and installed an integrated package of
anti-ligature radiator covers and matching steel pipe boxing, with additional bespoke items introduced along the way.

100+ radiator covers
500m+ steel pipe boxing
Survey • manufacture • supply • install
Scope delivered

100+ bespoke anti-ligature radiator covers, 500m+ steel pipe boxing, plus additional bespoke items during delivery.

Outcome

Fast turnaround, delivered within programme, supporting smooth project close-out.

Project overview

Sector

Secure environment (IRC)

Location

Oxfordshire, UK

Deliverables

Over 100 bespoke radiator covers and over 500m of steel pipe boxing, plus bespoke additions during delivery.

Driver

A cost-effective anti-ligature alternative that stayed practical for installation and consistent across a large programme.

Approach: Survey-led delivery with in-house manufacture, allowing phased installs and quick additions as the programme progressed.

The challenge

The contractor required an anti-ligature solution that met the intent for a secure environment while remaining commercially sensible and practical on site.
On large programmes, success is usually defined by:

  • Repeatability: a solution that can be rolled out consistently across many areas
  • Survey accuracy: confirming real conditions early to avoid remedials and delays
  • Fast turnaround: keeping pace as areas became ready for fit-out and close-out
  • Consistent detailing: radiator covers and pipe boxing delivered as one coordinated package
  • Adaptability: ability to add bespoke items as requirements emerged

Delivery approach

The programme stayed on track by keeping the workflow simple and site-friendly:

  • Survey and validation: confirm sizes, constraints and fixing approach
  • Manufacture: bespoke production while keeping detailing consistent across large quantities
  • Supply and install: phased delivery to match areas becoming ready on site
  • Close-out support: fast turnaround to maintain momentum as the project came to completion
What made the difference: survey-led delivery plus in-house manufacture meant new requirements could be incorporated quickly without derailing the wider programme.

Results

  • 100+ anti-ligature radiator covers delivered as part of a coordinated package
  • 500m+ steel pipe boxing installed to protect services and complete the finish
  • Bespoke additions delivered during the programme (including sloping tops for hand driers)
  • Fast turnaround and programme-aligned delivery supporting close-out
  • Single supplier responsibility for survey, manufacture, supply and installation

“Coverad provided a practical, cost-effective anti-ligature package and kept pace as the build progressed.
Survey-led delivery and the ability to add bespoke items helped keep close-out moving.”

— Project team, national main contractor